Search words under length of 4 characters are not processed.
1388 results:
671. Capital repair of SI Secondary School No.2 after Moldagaliyev with an address at Chingirlauskaya street, 7A of Uralsk, WKO  
Capital repair of SI Secondary School No.2 after Moldagaliyev with an address at Chingirlauskaya street, 7A of Uralsk, WKO Implemented by PK Donostroitel Project value: $ 1,300,000  
672. Preparation of the design and engineering requirements for construction of Youth and Schoolchildren’s Palace in Uralsk  
2013  Preparation of the design and engineering requirements for construction of Youth and Schoolchildren’s Palace in Uralsk  Performed by: SRDI «Gaszhobalau» LLP     Budget:  
673. Construction of the Youth and Schoolchildren's Palace in Uralsk  
Construction of the Youth and Schoolchildren's Palace in Uralsk; Implemented by Altair LLP Project value: $ 13,600,000  
674. September 2006  
 
675. September 2009  
 
676. September 2005  
 
677. September 2008  
 
678. September 2010  
 
679. September 2011  
 
680. September 2012  
 
Search results 671 until 680 of 1388